s77m
                         Moore Haven Lock and Dam (S-77)
                 Daily Morning Report Data Ending at 2400 Hours
 
 Note: Headwater, tailwater, and stage values below are instantaneous values
       unless otherwise specified.
       Flow value is an Average-Daily Value at Spillway
                                    ===Wind====                           Manual
        Head    Tail   Flow  Precip  Dir  Speed Locks  Barometer     Evap Precip
      (ft-msl)(ft-msl) (cfs)  (in)  (deg) (mph)  (#)  (Hg") (mBar)   (in)  (in)
15AUG19 12.44   11.35     0   1.34   176   7.3    5   30.05 1017.5  0.00   1.20
16AUG19 12.79   11.05     0   0.03   158   2.6    8   30.08 1018.6  0.17   0.00
17AUG19 13.08   11.02     0   1.20   167   3.3    9   30.11 1019.5  0.00   1.08
18AUG19 12.94   11.06     0   0.00    54   1.4    4   30.08 1018.6  0.21   0.00
19AUG19 13.08   10.71     0   0.00   113   1.7    4   30.08 1018.7  0.24   0.00
20AUG19 13.22   10.54     0   0.00   101   4.7    9   30.10 1019.4  0.27   0.00
21AUG19 13.35   10.72     0   2.57   128   3.7    1   30.07 1018.2  0.30   0.00
 
       Gate Openings (ft) Gate1  Gate2  Gate3  Gate4
15AUG19                     0.0    0.0    0.0    0.0
16AUG19                     0.0    0.0    0.0    0.0
17AUG19                     0.0    0.0    0.0    0.0
18AUG19                     0.0    0.0    0.0    0.0
19AUG19                     0.0    0.0    0.0    0.0
20AUG19                     0.0    0.0    0.0    0.0
21AUG19                     0.0    0.0    0.0    0.0
Report Generated 22AUG2019 @ 15:39