Moore Haven Lock and Dam (S-77)
                 Daily Morning Report Data Ending at 2400 Hours
 
 Note: Headwater, tailwater, and stage values below are instantaneous values
       unless otherwise specified.
       Flow value is an Average-Daily Value
                                    ===Wind====                           Manual
        Head    Tail   Flow  Precip  Dir  Speed Locks  Barometer     Evap Precip
      (ft-msl)(ft-msl) (cfs)  (in)  (deg) (mph)  (#)  (Hg") (mBar)   (in)  (in)
23AUG16 14.80   11.22   955   0.00   119   1.0    2   30.09 1018.9  0.30   0.00
24AUG16 14.95   11.16   954   0.00    74   2.2    3   30.01 1016.4  0.28   0.25
25AUG16 14.83   10.92   795   0.19    58   2.0    2   29.96 1014.6  0.29   0.20
26AUG16 14.84   10.49   614   0.57   125   0.2    3   29.97 1014.9  0.24   0.53
27AUG16 14.90   10.72   478   0.00    80   1.4    6   29.93 1013.5  0.31   0.00
28AUG16 14.87   10.94   344   0.24   125   2.5    3   29.93 1013.4  0.28   0.22
29AUG16 14.90   10.93   477   0.20   161   2.1    3   29.91 1013.0  0.24   0.25
 
       Gate Openings (ft) Gate1  Gate2  Gate3  Gate4
23AUG16                     0.0    2.5    2.5    0.0
24AUG16                     0.0    2.0    2.0    0.0
25AUG16                     0.0    2.0    2.0    0.0
26AUG16                     0.0    2.0    0.0    0.0
27AUG16                     0.0    2.0    0.0    0.0
28AUG16                     0.0    2.0    0.0    0.0
29AUG16                     0.0    2.0    2.0    0.0
Report Generated 30AUG2016 @ 14:15