s77m
                         Moore Haven Lock and Dam (S-77)
                 Daily Morning Report Data Ending at 2400 Hours
 
 Note: Headwater, tailwater, and stage values below are instantaneous values
       unless otherwise specified.
       Flow value is an Average-Daily Value at Spillway
                                    ===Wind====                           Manual
        Head    Tail   Flow  Precip  Dir  Speed Locks  Barometer     Evap Precip
      (ft-msl)(ft-msl) (cfs)  (in)  (deg) (mph)  (#)  (Hg") (mBar)   (in)  (in)
10DEC18 12.86   10.92  1220   0.00    48   2.6    9   30.17 1021.6  0.09   0.00
11DEC18 12.79   11.26  1222   0.00   346   5.0    6   30.28 1025.3  0.07   0.00
12DEC18 12.98   11.21   459   0.00    92   3.0    9   30.17 1021.8  0.12   0.00
13DEC18 12.86   10.98   135   0.00    66   2.7   11   30.06 1018.1  0.13   0.00
14DEC18 12.73   10.86   804   0.00   161  10.3    9   29.99 1015.7  0.00   0.28
15DEC18 12.72   10.97  1236   0.58   259   2.2   10   30.10 1019.3  0.11   0.03
16DEC18 12.75   11.06  1190    NR    341   5.6   NR   30.14 1020.5    NR     NR
 
       Gate Openings (ft) Gate1  Gate2  Gate3  Gate4
10DEC18                     0.0    3.5    3.5    0.0
11DEC18                     0.0    3.5    3.5    0.0
12DEC18                     0.0    2.5    0.0    0.0
13DEC18                     0.0    0.0    0.0    0.0
14DEC18                     0.0    3.5    3.5    0.0
15DEC18                     0.0    3.5    3.5    0.0
16DEC18                     0.0    3.5    3.5    0.0
Report Generated 17DEC2018 @ 04:38