s77m
                         Moore Haven Lock and Dam (S-77)
                 Daily Morning Report Data Ending at 2400 Hours
 
 Note: Headwater, tailwater, and stage values below are instantaneous values
       unless otherwise specified.
       Flow value is an Average-Daily Value at Spillway
                                    ===Wind====                           Manual
        Head    Tail   Flow  Precip  Dir  Speed Locks  Barometer     Evap Precip
      (ft-msl)(ft-msl) (cfs)  (in)  (deg) (mph)  (#)  (Hg") (mBar)   (in)  (in)
11FEB19 12.80   11.16   772   0.00   138   3.1    8   30.08 1018.6  0.19   0.16
12FEB19 12.73   11.24   448   0.00   140   3.7   13   30.01 1016.4  0.00   0.78
13FEB19 13.05   11.56    20   0.00   355   7.8    7   30.11 1019.5  0.04   0.25
14FEB19 12.88   11.17     0   0.00    56   4.3    9   30.01 1016.4  0.16   0.00
15FEB19 12.57   10.89   526   0.00   272   1.4   16   29.94 1014.0  0.18   0.00
16FEB19 12.73   11.25  1331   0.00   177   2.9   14   29.94 1014.0  0.18   0.00
17FEB19 12.90   11.19   719   0.00   157   4.7   14   30.03 1017.0  0.19   0.00
 
       Gate Openings (ft) Gate1  Gate2  Gate3  Gate4
11FEB19                     0.0    3.5    3.5    2.0
12FEB19                     0.0    0.0    0.0    0.5
13FEB19                     0.0    0.0    0.0    0.0
14FEB19                     0.0    0.0    0.0    0.0
15FEB19                     0.0    3.0    3.5    2.0
16FEB19                     0.0    2.5    3.0    2.0
17FEB19                     0.0    0.0    0.0    1.5
Report Generated 18FEB2019 @ 21:15