s80m
                         St. Lucie Lock and Dam (S-80)
                 Daily Morning Report Data Ending at 2400 Hours
 
 Note: Headwater, tailwater, and stage values below are instantaneous values
      unless otherwise specified.
 
                                    ===Wind====                           Manual
        Head    Tail   Flow  Precip  Dir  Speed Locks  Barometer          Precip
      (ft-msl)(ft-msl) (cfs)  (in)  (deg) (mph)  (#)  (Hg") (mBar)         (in)
13MAY18 12.79    1.23     0   0.00   109   2.8    9   30.03 1016.9         1.50
14MAY18 14.72    1.61     0   0.00   173   2.7   13   29.97 1014.8         1.55
15MAY18 12.96    1.72  1196   0.00   170   2.1   12   30.00 1015.8         0.45
16MAY18 14.68    1.21   405   0.00   195   1.8    9   29.98 1015.4         0.38
17MAY18 14.52    0.90  1596   0.00   104   3.3   13   29.99 1015.6         1.45
18MAY18 13.83    0.77  1301   0.00    92   1.1   14   30.01 1016.4         0.01
19MAY18 14.13    0.21   960    NR     85   3.3   11   30.10 1019.3           NR
 
       Gate Openings (ft) Gate1  Gate2  Gate3  Gate4  Gate5  Gate6  Gate7
13MAY18                     0.0    0.0    0.0    0.0    0.0    0.0    0.0
14MAY18                     0.0    0.0    0.0    0.0    0.0    0.0    0.0
15MAY18                     0.0    2.5    0.0    1.0    2.5    0.0    0.0
16MAY18                     0.0    0.0    0.0    0.0    0.0    0.0    0.0
17MAY18                     0.0    1.0    0.0    0.0    0.5    0.0    0.0
18MAY18                     0.0    2.5    0.0    0.0    2.5    0.0    0.0
19MAY18                     0.0    2.5    0.0    0.0    2.0    0.0    0.0
Report Generated 20MAY2018 @ 05:15