Data Ending 2400 hours   25 MAY 2017
 
Note: Headwater, tailwater, and stage values below are instantaneous values
      unless otherwise specified.
 
             Headwater Tailwater         ----------- Gate Positions ------------
             Elevation Elevation  Disch   #1   #2   #3   #4   #5   #6   #7   #8
             (ft-msl)  (ft-msl)   (cfs)  (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
                               (I) see note
Water Conservation Area #1
  Site 1-7:    16.10       3 Station Average  =  16.07
  Site 1-8T:   16.04       (Site 1-7, 1-8T and 1-9)
  Site 1-8C:   16.11       2 Station Average  =  16.06
  Site 1-9:    16.08       (Site 1-9 and 1-8T for Temp. Deviation)
  L8:           -NR-
  BLW S5AW:     -NR-
  S5AW:        10.58                     0.00 0.00
  S5AE:        13.02     12.56           3.70 3.70
  S5AS:         -NR-                     -NR- -NR-
  S5A Pumps:   10.59     17.25     360      0  360    0    0    0    0 (cfs)
 
 
  S10D:        15.96     12.85       0   0.00 0.00 0.00 0.00
  S10C:        15.95     12.84       0   0.00 0.00 0.00 0.00
  S10A:        15.97     12.84       0   0.00 0.00 0.00 0.00
  Total S10 Discharge:               0
 
  S39:         16.03      8.56       0   0.00
 G256:          -NR-      -NR-
 G300:         17.33     15.86           0.00 0.00
 G301:         17.23     15.98           0.00 0.00 0.00
 G302:         17.35     11.44           0.00 0.00
                                         Speed of Pumps (RPM)
 G310:          -NR-      -NR-          -NR--NR--NR--NR--NR--NR-
 G250:          7.54      -NR-          -NR--NR--NR--NR--NR-
 G251:         11.65     15.90          -NR--NR--NR--NR--NR-
Daily Precipitation Totals        1-Day       3-Day       7-Day
                                 (inches)    (inches)    (inches)
  S5A Pump Station:                -NR-        0.00        0.00
  Site 1-7:                        0.00        0.00        0.00
  Site 1-8T:                       0.00        0.00        0.00
  Site 1-8C:(Bad Gage)             0.07       16.13       79.85
  Site 1-9:                        -NR-        0.00        0.00
  S6 Pump Station:                 -NR-        0.00        0.00
  S10D: (Bad Gage)                 -NR-        0.00        0.00
  -----------------------------------------------------------------
        WCA-1 Average  (Gages)     0.00        0.00        0.00
        (Site 1-8C and S10D not included)
  -----------------------------------------------------------------
  WCA1 Nexrad Basin Avg            -NR-        1.27        1.28
  -----------------------------------------------------------------
 
 
WCA-1 Area Regulation                      Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 1-8C                                   16.11       15.75       0.36
  Average of Sites 1-7, 1-9, 1-8T             16.07       15.75       0.32
  Zone A2 with Site 1-8C                      16.11       15.75       0.36
  Zone A2 with Site 1-7, 1-9, 1-8T            16.07       15.75       0.32
  Floor (Site 8C)                             16.11       14.00       2.11
  Floor (AVG Site 7,9,8T)                     16.07       14.00       2.07
 
  Regulation Zone Elevations              A2= 15.75   B= 15.75   C= 14.00
 
 ------------------------------------------------------------------------------
 *    DATES     !    USE GAGE      !        CONDITIONS                        *
 * 1JAN - 30JUN ! 1-8C (Canal)     !    All                                   *
 * 1JUL - 31DEC ! 1-8C (Canal)     !    Except as noted below                 *
 *              ! Average of 1-7,  !    During rising stages when canal       *
 *              ! 1-8T, and 1-9    !    stage exceeds average.                *
 ------------------------------------------------------------------------------
 
                                       3Station   Diff  Site8C   Diff
WCA-1 Elevations      25 MAY 2017         16.07          16.11
   25MAY17  -1 Day  = 24 MAY 2017 @ 2400  16.04  -0.03   16.08  -0.03
   25MAY17  -2 Days = 23 MAY 2017 @ 2400  15.87  -0.20   15.88  -0.23
   25MAY17  -3 Days = 22 MAY 2017 @ 2400  15.85  -0.22   15.89  -0.22
   25MAY17  -4 Days = 21 MAY 2017 @ 2400  15.88  -0.19   15.90  -0.21
   25MAY17  -5 Days = 20 MAY 2017 @ 2400  15.90  -0.17   15.95  -0.16
   25MAY17  -6 Days = 19 MAY 2017 @ 2400  15.91  -0.16   15.97  -0.14
   25MAY17  -7 Days = 18 MAY 2017 @ 2400  15.94  -0.13   16.02  -0.09
   25MAY17 -30 Days = 25 APR 2017 @ 2400  16.05  -0.02   16.01  -0.10
 
___________________________________________________________________________
 
Water Conservation Area #2
  S6 Pumps:     -NR-     13.77       0      0    0    0                (cfs)
 
  Average of Sites 1-9 and 1-8T               16.06
  7 Day Recession Rate (ft/wk)                -0.16
  (Note: Rainfall check not complete)
                                             ELEV      Diff
2Station Avg.         25 MAY 2017             16.06
   25MAY17  -1 Day  = 24 MAY 2017 @ 2400      16.03    -0.03
   25MAY17  -2 Days = 23 MAY 2017 @ 2400      15.81    -0.25
   25MAY17  -3 Days = 22 MAY 2017 @ 2400      15.81    -0.25
   25MAY17  -4 Days = 21 MAY 2017 @ 2400      15.84    -0.22
   25MAY17  -5 Days = 20 MAY 2017 @ 2400      15.85    -0.21
   25MAY17  -6 Days = 19 MAY 2017 @ 2400      15.87    -0.19
   25MAY17  -7 Days = 18 MAY 2017 @ 2400      15.90    -0.16
   25MAY17 -30 Days = 25 APR 2017 @ 2400      15.99    -0.07
___________________________________________________________________________
 
(I) - Flows marked with "I" signify that this is an instantaneous flow
      computed from the single value reported for the day.
      Otherwise, flow is a daily average.
Report Generated 26 MAY 2017 @ 05:15