wca1
 
                          U. S. Army Corps of Engineers
                              Jacksonville District
 
                        Water Conservation Area #1 Report
 
Data Ending 2400 hours   17 FEB 2019
 
Note: Headwater, tailwater, and stage values below are instantaneous values
      unless otherwise specified.
 
             Headwater Tailwater         ----------- Gate Positions ------------
             Elevation Elevation  Disch   #1   #2   #3   #4   #5   #6   #7   #8
             (ft-msl)  (ft-msl)   (cfs)  (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
                               (I) see note
Water Conservation Area #1
Inflows
 G300:         14.43     16.52       0   0.00 0.00
 G301:         14.44     16.65       0   0.00 0.00 0.00
                                        Speed of Pumps S362,G251,G310 (RPM)
 S362:         12.34     16.66      34     0   0   0   0   0-NR--NR-
 G251:         11.77     16.57      29  -NR--NR--NR--NR--NR-
 G310:          -NR-      -NR-       0  -NR--NR-   1   0   0   0
Net Inflows:     63      cfs
________________________________________________________________________________
Outflows
  S10D:        16.57     13.65     257   0.00 1.00 0.00 0.00
  S10C:        16.60     13.57       0   0.00 0.00 0.00 0.00
  S10A:        16.56     13.55       0   0.00 0.00 0.00 0.00
  Total S10 Discharge:             257
  G94A:        13.90     16.60       0   0.00 0.00
  G94C:         -NR-      -NR-       0   -NR- -NR-
  S39:         16.63      8.66       0   0.00
  G338:                              0
  S5AS:        12.09     14.37       0
Net Outflows:    257     cfs
Net Flows (Inflows - Outflows):   -194    cfs
________________________________________________________________________________
Stage
  Site 1-7:    16.56       3 Station Average  =  16.57
  Site 1-8T:   16.57       (Site 1-7, 1-8T and 1-9)
  Site 1-8C:   16.71       2 Station Average  =  16.58
  Site 1-9:    16.59       (Site 1-9 and 1-8T for Temp. Deviation)
  L8:           -NR-
  BLW S5AW:     -NR-
  S5AW:        10.38
________________________________________________________________________________
Daily Precipitation Totals
                                 1-Day       3-Day       7-Day
                                 (inches)    (inches)    (inches)
  S5A Pump Station:                -NR-        0.00        0.00
  Site 1-7:                        0.00        0.00        0.00
  Site 1-8T:                       0.00        0.00        0.00
  Site 1-8C:(Bad Gage)             0.00        0.00        0.00
  Site 1-9:                        -NR-        0.00        0.00
  S6 Pump Station:                 -NR-        0.00        0.00
  S10D: (Bad Gage)                 -NR-        0.00        0.00
  -----------------------------------------------------------------
        WCA-1 Average  (Gages)     0.00        0.00        0.00
        (Site 1-8C and S10D not included)
  -----------------------------------------------------------------
  WCA1 Nexrad Basin Avg            -NR-        0.00        0.00
  -----------------------------------------------------------------
 
________________________________________________________________________________
WCA-1 Regulation Schedules
                                            Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 1-8C                                   16.71       16.65       0.06
  Average of Sites 1-7, 1-9, 1-8T             16.57       16.65      -0.08
  Zone A2 with Site 1-8C                      16.71       16.65       0.06
  Zone A2 with Site 1-7, 1-9, 1-8T            16.57       16.65      -0.08
  Floor (Site 8C)                             16.71       14.00       2.71
  Floor (AVG Site 7,9,8T)                     16.57       14.00       2.57
 
  Regulation Zone Elevations              A2= 16.65   B= 16.65   C= 14.00
  Available storage:    12,600 acre-feet
 
 ------------------------------------------------------------------------------
 *    DATES     !    USE GAGE      !        CONDITIONS                        *
 * 1JAN - 30JUN ! 1-8C (Canal)     !    All                                   *
 * 1JUL - 31DEC ! 1-8C (Canal)     !    Except as noted below                 *
 *              ! Average of 1-7,  !    During rising stages when canal       *
 *              ! 1-8T, and 1-9    !    stage exceeds average.                *
 ------------------------------------------------------------------------------
 
                                       3Station   Diff  Site8C   Diff
WCA-1 Elevations      17 FEB 2019         16.57          16.71
   17FEB19  -1 Day  = 16 FEB 2019 @ 2400  16.60   0.03   16.74   0.03
   17FEB19  -2 Days = 15 FEB 2019 @ 2400  16.60   0.03   16.76   0.05
   17FEB19  -3 Days = 14 FEB 2019 @ 2400  16.61   0.04   16.77   0.06
   17FEB19  -4 Days = 13 FEB 2019 @ 2400  16.62   0.05   16.78   0.07
   17FEB19  -5 Days = 12 FEB 2019 @ 2400  16.55  -0.02   16.70  -0.01
   17FEB19  -6 Days = 11 FEB 2019 @ 2400  16.56  -0.01   16.71   0.00
   17FEB19  -7 Days = 10 FEB 2019 @ 2400  16.56  -0.01   16.71   0.00
   17FEB19 -30 Days = 18 JAN 2019 @ 2400  16.03  -0.54   16.13  -0.58
 
  S5AE:        12.10     11.34           0.30 0.30
  S5A Pumps:   10.40     14.42       0      0    0    0    0    0    0 (cfs)
 G302:         14.41     12.40           0.00 0.00
___________________________________________________________________________
___________________________________________________________________________
Water Conservation Area #2
  S6 Pumps:    10.44     14.27       0      0    0    0                (cfs)
 
  Average of Sites 1-9 and 1-8T               16.58
  7 Day Recession Rate (ft/wk)                 0.00
  (Note: Rainfall check not complete)
                                             ELEV      Diff
2Station Avg.         17 FEB 2019             16.58
   17FEB19  -1 Day  = 16 FEB 2019 @ 2400      16.61     0.03
   17FEB19  -2 Days = 15 FEB 2019 @ 2400      16.62     0.04
   17FEB19  -3 Days = 14 FEB 2019 @ 2400      16.62     0.04
   17FEB19  -4 Days = 13 FEB 2019 @ 2400      16.63     0.05
   17FEB19  -5 Days = 12 FEB 2019 @ 2400      16.56    -0.02
   17FEB19  -6 Days = 11 FEB 2019 @ 2400      16.57    -0.01
   17FEB19  -7 Days = 10 FEB 2019 @ 2400      16.58     0.00
   17FEB19 -30 Days = 18 JAN 2019 @ 2400      16.05    -0.53
___________________________________________________________________________
 
(I) - Flows marked with "I" signify that this is an instantaneous flow
      computed from the single value reported for the day.
      Otherwise, flow is a daily average.
Report Generated 18 FEB 2019 @ 22:38
** Preliminary Data - Subject to Revision **