U. S. Army Corps of Engineers
                              Jacksonville District
 
                        Water Conservation Area #2 Report
 
Data Ending 2400 hours   28 MAR 2017
 
Note: Headwater, tailwater, and stage values below are instantaneous values
      unless otherwise specified.
 
             Headwater Tailwater            --------- Gate Positions ----------
             Elevation Elevation  Discharge  #1    #2    #3    #4    #5    #6
             (ft-msl)  (ft-msl)     (cfs)   (ft)  (ft)  (ft)  (ft)  (ft)  (ft)
 
Water Conservation Area #2A
  Site 2-17:   11.47
  Site 2-19:   11.10
  S7 Pumps:    10.20     10.53       96        0    87     0              (cfs)
  S7 Gates:                           0     0.00
  S11C:        10.54      8.94        0     0.00  0.00  0.00  0.00
  S11B:        10.56      8.93        0     0.00  0.00  0.00  0.00
  S11A:        10.56      8.90        0     0.00  0.00  0.00  0.00
  Total S11 Discharge:                0
  S144:         -NR-      -NR-               0.00
  S145:         -NR-      -NR-               0.00
  S146:         -NR-      -NR-               0.00
  S38:         10.59      7.08       29      0.30  0.30
  S38C:         -NR-      -NR-
 
Water Conservation Area #2B
  Site 99:      9.32
  S124:         4.73      4.35
  S34:          -NR-      -NR-        8      -NR-  -NR-
 
 
Daily Precipitation Totals        1-Day       3-Day       7-Day
                                 (inches)    (inches)    (inches)
  Site 2-17: (Bad Gage)            -NR-         0.00        0.00
  Site 2-19:                       0.00         0.00        0.00
  S7 Pump Station:                 -NR-         0.00        0.00
  S11A: (Bad Gage)                 -NR-         0.00        0.00
  -----------------------------------------------------------------
        WCA-2A Average (Gages)     0.00         0.00        0.00
        (Site 2-17 and S11A not included)
  -----------------------------------------------------------------
  WCA2A Nexrad Basin Avg           -NR-         0.03        0.66
  WCA2B Nexrad Basin Avg           -NR-         0.01        0.69
  -----------------------------------------------------------------
 
 
WCA-2A Area Regulation                     Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 2-17                                   11.47       11.00       0.47
  Site S11B Headwater                         10.56       11.00      -0.44
  Floor (Site 17)                             11.47       10.50       0.97
  Floor (S11BHW)                              10.56       10.50       0.06
 
 ------------------------------------------------------------------------------
 *     DATE     ! USE GAGE !                   CONDITIONS                     *
 * 1JAN - 31JAN !   2-17   !  If 2-17 stage recedes to 11.5 ft NGVD, switch   *
 *              !          !  to S-11B headwater gage.                        *
 * 1FEB - 30JUN !   S-11B  !                       ALL                        *
 * 1JUL - 31DEC !   2-17   !                       ALL                        *
 ------------------------------------------------------------------------------
 
                                           Site17   Diff      S11BHW   Diff
WCA-2A Elevations      28 MAR 2017         11.47              10.56
   28MAR17  -1 Day  =  27 MAR 2017 @ 2400  11.49     0.02     10.44    -0.12
   28MAR17  -2 Days =  26 MAR 2017 @ 2400  11.51     0.04     10.46    -0.10
   28MAR17  -3 Days =  25 MAR 2017 @ 2400  11.51     0.04     10.46    -0.10
   28MAR17  -4 Days =  24 MAR 2017 @ 2400  11.50     0.03     10.46    -0.10
   28MAR17  -5 Days =  23 MAR 2017 @ 2400  11.50     0.03     10.48    -0.08
   28MAR17  -6 Days =  22 MAR 2017 @ 2400  11.45    -0.02     10.49    -0.07
   28MAR17  -7 Days =  21 MAR 2017 @ 2400  11.47     0.00     10.53    -0.03
   28MAR17 -30 Days =  26 FEB 2017 @ 2400  11.74     0.27     11.31     0.75
 
 
Report Generated 29 MAR 2017 @ 08:45
** Preliminary Data - Subject to Revision **