Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: 15.90 ft 3-Station: 15.98 ft |
16.37 ft |
|
WCA-2A |
Site 2-17: 12.16 ft S-11B HW: 12.19 ft |
11.00 ft |
|
WCA-3A |
3-Station: 8.47 ft |
10.02 ft |
| Current Lake Release Schedule* |
| West (S-79) |
350 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
1081 cfs |
| West (S-77) |
376 cfs |
35% |
| West (S-79) |
587 cfs |
|
| East (S-308) |
111 cfs |
10% |
| East (S-80) |
0 cfs |
|
| South |
587 cfs |
54% |
| Other |
6 cfs |
1% |
BCNP
ENP
Pump inflows: -NR-
Other inflows: 0
Other outflows: 0
S-352: -NR-
S-351: -NR-
S-354: -NR-
STAs to
WCA-1:
0
S-155A: -NR-
STAs to
WCA-2A:
0
STAs to
WCA-3A:
0
S-10s: 0
S-11s: 0
S-12s: -NR-
S-39: -NR-
S-38: -NR-
S-34E: -NR-
S-31: -NR-
S-337: -NR-
S-190: -NR-
S-140: -NR-
S-151: 0
S-344: 0
S-343s: 0
S-333: -NR-
S-333N: -NR-
S-334: -NR-
S-356: -NR-
®
U.S. Army Corps of Engineers