Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: 16.46 ft 3-Station: 16.18 ft |
16.04 ft |
|
WCA-2A |
Site 2-17: 12.05 ft S-11B HW: 12.11 ft |
11.00 ft |
|
WCA-3A |
3-Station: 8.04 ft |
9.81 ft |
| Current Lake Release Schedule* |
| West (S-79) |
350 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
355 cfs |
| West (S-77) |
197 cfs |
55% |
| West (S-79) |
1177 cfs |
|
| East (S-308) |
-39 cfs |
-11% |
| East (S-80) |
0 cfs |
|
| South |
92 cfs |
26% |
| Other |
0 cfs |
0% |
BCNP
ENP
Pump inflows: 0
Other inflows: 48
Other outflows: 0
S-352: 0
S-351: 749
S-354: 356
STAs to
WCA-1:
600
S-155A: 0
STAs to
WCA-2A:
30
STAs to
WCA-3A:
353
S-10s: 0
S-11s: 0
S-12s: 0
S-39: 0
S-38: 75
S-34E: 0
S-31: 0
S-337: 114
S-190: 0
S-140: 0
S-151: 108
S-344: 0
S-343s: 0
S-333: 0
S-333N: 45
S-334: 0
S-356: 0
®
U.S. Army Corps of Engineers