Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: -NR- ft 3-Station: -NR- ft |
15.78 ft |
|
WCA-2A |
Site 2-17: -NR- ft S-11B HW: -NR- ft |
11.00 ft |
|
WCA-3A |
3-Station: -NR- ft |
9.65 ft |
| Current Lake Release Schedule* |
| West (S-79) |
350 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
2372 cfs |
| West (S-77) |
800 cfs |
34% |
| West (S-79) |
482 cfs |
|
| East (S-308) |
0 cfs |
0% |
| East (S-80) |
0 cfs |
|
| South |
1572 cfs |
66% |
| Other |
0 cfs |
0% |
BCNP
ENP
Pump inflows: -NR-
Other inflows: 0
Other outflows: 0
S-352: -NR-
S-351: -NR-
S-354: -NR-
STAs to
WCA-1:
0
S-155A: -NR-
STAs to
WCA-2A:
0
STAs to
WCA-3A:
0
S-10s: 0
S-11s: 0
S-12s: -NR-
S-39: -NR-
S-38: -NR-
S-34E: -NR-
S-31: 0
S-337: 127
S-190: -NR-
S-140: -NR-
S-151: 0
S-344: 0
S-343s: 0
S-333: -NR-
S-333N: -NR-
S-334: -NR-
S-356: -NR-
®
U.S. Army Corps of Engineers