Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: 15.44 ft 3-Station: 15.23 ft |
15.75 ft |
|
WCA-2A |
Site 2-17: 11.15 ft S-11B HW: 10.51 ft |
11.02 ft |
|
WCA-3A |
3-Station: 8.88 ft |
9.70 ft |
| Current Lake Release Schedule* |
| West (S-79) |
250 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
373 cfs |
| West (S-77) |
74 cfs |
20% |
| West (S-79) |
470 cfs |
|
| East (S-308) |
-304 cfs |
-81% |
| East (S-80) |
0 cfs |
|
| South |
300 cfs |
80% |
| Other |
0 cfs |
0% |
BCNP
ENP
Pump inflows: 343
Other inflows: 128
Other outflows: 0
S-352: 0
S-351: 0
S-354: 0
STAs to
WCA-1:
60
S-155A: 218
STAs to
WCA-2A:
192
STAs to
WCA-3A:
384
S-10s: 0
S-11s: 0
S-12s: 8
S-39: 73
S-38: 0
S-34E: 0
S-31: 0
S-337: 0
S-190: 0
S-140: 146
S-151: 78
S-344: 0
S-343s: 0
S-333: 226
S-333N: 0
S-334: 0
S-356: 0
®
U.S. Army Corps of Engineers