Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: 16.24 ft 3-Station: 15.72 ft |
16.50 ft |
|
WCA-2A |
Site 2-17: 12.71 ft S-11B HW: 12.76 ft |
11.89 ft |
|
WCA-3A |
3-Station: 9.16 ft |
9.96 ft |
| Current Lake Release Schedule* |
| West (S-79) |
250 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
901 cfs |
| West (S-77) |
0 cfs |
0% |
| West (S-79) |
1754 cfs |
|
| East (S-308) |
0 cfs |
0% |
| East (S-80) |
0 cfs |
|
| South |
843 cfs |
94% |
| Other |
58 cfs |
6% |
BCNP
ENP
Pump inflows: 309
Other inflows: 108
Other outflows: 0
S-352: 0
S-351: 0
S-354: 0
STAs to
WCA-1:
367
S-155A: 65
STAs to
WCA-2A:
479
STAs to
WCA-3A:
304
S-10s: 0
S-11s: 0
S-12s: 80
S-39: 0
S-38: 0
S-34E: 0
S-31: 0
S-337: 0
S-190: 172
S-140: 143
S-151: 0
S-344: 0
S-343s: 0
S-333: 314
S-333N: 312
S-334: 0
S-356: 249
®
U.S. Army Corps of Engineers