Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: 16.30 ft 3-Station: 15.73 ft |
16.86 ft |
|
WCA-2A |
Site 2-17: 12.89 ft S-11B HW: 12.94 ft |
12.24 ft |
|
WCA-3A |
3-Station: 9.13 ft |
10.06 ft |
| Current Lake Release Schedule* |
| West (S-79) |
250 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
360 cfs |
| West (S-77) |
0 cfs |
0% |
| West (S-79) |
1992 cfs |
|
| East (S-308) |
0 cfs |
0% |
| East (S-80) |
0 cfs |
|
| South |
278 cfs |
77% |
| Other |
82 cfs |
23% |
BCNP
ENP
Pump inflows: 83
Other inflows: 0
Other outflows: 78
S-352: 0
S-351: 9
S-354: 3
STAs to
WCA-1:
77
S-155A: 76
STAs to
WCA-2A:
34
STAs to
WCA-3A:
167
S-10s: 0
S-11s: 0
S-12s: 134
S-39: 0
S-38: 84
S-34E: 0
S-31: 0
S-337: 0
S-190: 63
S-140: 82
S-151: 0
S-344: 0
S-343s: 0
S-333: 270
S-333N: 264
S-334: 0
S-356: 133
®
U.S. Army Corps of Engineers