Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: 16.57 ft 3-Station: 16.11 ft |
17.12 ft |
|
WCA-2A |
Site 2-17: 12.39 ft S-11B HW: 12.54 ft |
12.50 ft |
|
WCA-3A |
3-Station: 9.01 ft |
10.14 ft |
| Current Lake Release Schedule* |
| West (S-79) |
350 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
250 cfs |
| West (S-77) |
0 cfs |
0% |
| West (S-79) |
1974 cfs |
|
| East (S-308) |
-1123 cfs |
**** |
| East (S-80) |
0 cfs |
|
| South |
0 cfs |
0% |
| Other |
250 cfs |
100% |
BCNP
ENP
Pump inflows: 135
Other inflows: 576
Other outflows: 372
S-352: 0
S-351: 0
S-354: 0
STAs to
WCA-1:
992
S-155A: 108
STAs to
WCA-2A:
3682
STAs to
WCA-3A:
1017
S-10s: 0
S-11s: 0
S-12s: 50
S-39: 0
S-38: 0
S-34E: 0
S-31: 0
S-337: 0
S-190: 29
S-140: 350
S-151: 0
S-344: 0
S-343s: 0
S-333: 430
S-333N: 0
S-334: 0
S-356: 132
®
U.S. Army Corps of Engineers