Lake Okeechobee and WCAs
| Area |
Stages (hover for notes) |
Schedule |
|
WCA-1 |
Site 1-8C: 17.18 ft 3-Station: 16.96 ft |
17.50 ft |
|
WCA-2A |
Site 2-17: 14.21 ft S-11B HW: 14.30 ft |
12.84 ft |
|
WCA-3A |
3-Station: 9.72 ft |
10.36 ft |
| Current Lake Release Schedule* |
| West (S-79) |
250 cfs |
Constant |
| East (S-80) |
0 cfs |
Constant |
| *Updates are generally made on Fridays |
| 7 Day Average Outflows and % of total |
| Total |
0 cfs |
| West (S-77) |
0 cfs |
0% |
| West (S-79) |
1252 cfs |
|
| East (S-308) |
-39 cfs |
**** |
| East (S-80) |
0 cfs |
|
| South |
0 cfs |
0% |
| Other |
0 cfs |
0% |
BCNP
ENP
Pump inflows: 610
Other inflows: 879
Other outflows: 0
S-352: 0
S-351: 0
S-354: 0
STAs to
WCA-1:
1144
S-155A: 706
STAs to
WCA-2A:
816
STAs to
WCA-3A:
527
S-10s: 0
S-11s: 0
S-12s: 315
S-39: 0
S-38: 0
S-34E: 0
S-31: 0
S-337: 0
S-190: 59
S-140: 143
S-151: 0
S-344: 0
S-343s: 0
S-333: 276
S-333N: 253
S-334: 0
S-356: 398
®
U.S. Army Corps of Engineers