ecc U. S. Army Corps of Engineers Jacksonville District East Coast Canals Report Data Ending 2400 hours 24 MAY 2026 Note: Headwater, tailwater, and stage values below are instantaneous values unless otherwise specified. Headwater Tailwater --------- Gate Positions ---------- Elevation Elevation Discharge #1 #2 #3 #4 #5 #6 (ft-msl) (ft-msl) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) Palm Beach County S155: 8.43 0.49 0.00 0.00 0.00 S155A: 11.65 8.37 0.00 0.00 North Dade County S30: 4.02 2.45 0.00 0.00 0.00 S337: -NR- -NR- 0.00 0.00 0.00 0.00 -NR- 0.00 S335: 4.83 4.44 113.0 1.50 S333: 7.06 6.43 12.0 0.10 S334: 6.43 4.41 0.0 0.00 S336: -NR- -NR- 0.00 0.00 0.00 Everglades National Park - South Dade Conveyance 3273: 4.33 Angels: 4.08 S331 PS/S173 3.64 2.96 3 Pumps S174: -NR- -NR- -NR- -NR- S332 PS: -NR- -NR- Total /#1 /#2 /#3 /#4 /#5 /#6 /#7 /#8 /#9 / Instantaneous Discharge: -NR- /NR /NR /NR /NR /NR /NR /NR /NR /NR / Daily Average Discharge: -NR- /NR /NR /NR /NR /NR /NR /NR /NR /NR / S332D PS: -NR- -NR- Total /#1 /#2 /#3 /#4 /#5 / Instantaneous Discharge: -NR- /NR /NR /NR /NR /NR / Daily Average Discharge: 0.0 / 1 / 2 /NR / 1 / 1 / S175: -NR- -NR- -NR- -NR- -NR- -NR- S176: 2.83 2.37 55.0 0.70 S177: 2.40 1.97 38.0 0.00 S178: 1.98 1.92 -NR- 6.90 6.90 S18C: 1.94 1.86 0.0 0.00 0.00 S197: 1.79 1.49 0.0 Daily Precipitation Totals 1-Day 3-Day 7-Day (inches) (inches) (inches) West Palm Beach FS: -NR- 0.00 0.00 Broward FS: -NR- 0.00 0.00 Miami FS: * -NR- 0.00 0.00 S331 PS: * -NR- 0.00 0.00 Homestead FS: * -NR- 0.00 0.00 * Average -NR- 0.00 0.00 (Includes Miami, S331 & Homestead) Report Generated 25 MAY 2026 @ 17:15 ** Preliminary Data - Subject to Revision **