realtime
          Recently Acquired Data
       Run Time = 06MAY2026 @ 12:52
 
THIS DATA IS PROCURED THROUGH AUTOMATED PROCESSES
AND IS UNVALIDATED.  THIS DATA SHOULD NOT BE USED
AS OFFICIAL DATA UNDER ANY CIRCUMSTANCES.
 
******** LAKE OKEECHOBEE *************************
 
8-Station Avg Elev    11.51 ft   06MAY2026 @ 11:00
8-Station Avg Elev Plot
__________________________________________________
LOSOM24 Reg ZoneA =                          16.81
LOSOM24 Reg ZoneBC =                         16.22
LOSOM24 Reg ZoneD =                          10.85
 
__________________________________________________
 
Total Inflow            172 cfs  06MAY2026 @ 11:00
                   =   0.01 feet/week      (stage)
 
Total Outflow          1778 cfs  06MAY2026 @ 11:15
                   =   0.05 feet/week      (stage)
 
Net Inflow            -1606 cfs    (instantaneous)
                   =  -3186 ac-ft/day     (volume)
                   =  -0.01 feet/day       (stage)
                   =  -0.05 feet/week      (stage)
 
-----Palmer Drought Severity Indices--------------
Lake Oke PDSI THC  =   Dry
 
1 Northwest           -2.85      04NOV2023 @ 24:00
2 North               -0.31      04NOV2023 @ 24:00
3 North Central       -2.19      04NOV2023 @ 24:00
4 South Central (LOK) -1.97      04NOV2023 @ 24:00
5 Everglades          -2.17      04NOV2023 @ 24:00
6 Lower East Coast    -0.07      04NOV2023 @ 24:00
7 Keys                -4.33      04NOV2023 @ 24:00
 
Very Wet             +3.00 or greater
Wet                  +1.50 to +2.99
Normal               -1.49 to +1.49
Dry                  -1.50 to -2.99
Very Dry             -3.00 or less
 
-----Caloosahatchee River Flows-------------------
S-77                    688 cfs  06MAY2026 @ 12:30
S-77       (7DayAvg)    675 cfs  06MAY2026 @ 12:30
Below S-77              895 cfs  06MAY2026 @ 11:45
Below S-77 (7DayAvg)    818 cfs  06MAY2026 @ 12:30
S-78                    170 cfs  06MAY2026 @ 12:30
S-79                    345 cfs  06MAY2026 @ 12:30
 
S-235 (b/w S77,BLW77)     0 cfs  06MAY2026 @ 11:00
S-47D (DS of BLW77)      48 cfs  06MAY2026 @ 11:00
 
-----Caloosahatchee River Elevations--------------
S-77 Headwater        11.38 ft   06MAY2026 @ 12:30
----------
S-77 Tailwater        10.59 ft   06MAY2026 @ 12:30
Below S-77 HW         10.70 ft   06MAY2026 @ 11:45
S-78 Headwater        10.66 ft   06MAY2026 @ 12:30
----------
S-78 Tailwater         2.98 ft   06MAY2026 @ 12:30
S-79 Headwater         3.16 ft   06MAY2026 @ 12:30
----------
S-79 Tailwater         1.80 ft   06MAY2026 @ 12:30
 
-----St. Lucie Canal Flows------------------------
S-308                     0 cfs  06MAY2026 @ 12:30
S-308       (7DayAvg)     - cfs  06MAY2026 @ 12:52
Below S-308               - cfs  06MAY2026 @ 12:52
Below S-308 (7DayAvg)    -2 cfs  06MAY2026 @ 12:30
S-80                      0 cfs  06MAY2026 @ 12:30
 Total Gate Opening    -0.1 ft   06MAY2026 @ 12:30
 
S-153                     0 cfs  06MAY2026 @ 11:00
 
-----St. Lucie Canal Elevations-------------------
S-308 Headwater       11.45 ft   06MAY2026 @ 12:30
----------
S-308 Tailwater       12.32 ft   06MAY2026 @ 12:30
Below S-308 HW         -NR- ft   06MAY2026 @ 12:52
Above S-80            10.88 ft   06MAY2026 @ 12:00
S-80 Headwater        12.31 ft   06MAY2026 @ 12:30
----------
S-80 Tailwater         1.34 ft   06MAY2026 @ 12:30
South Fork             -NR- ft   06MAY2026 @ 12:52
South Fork IR          -NR- ft   06MAY2026 @ 12:52
S-49 Tailwater         1.29 ft   06MAY2026 @ 11:00
 
-----Okeechobee Waterway Total Gate Openings------
S-77  Total Gate        6.0 ft   03MAY2026 @ 15:00
S-78  Total Gate        0.5 ft   03MAY2026 @ 12:01
S-79  Total Gate        1.5 ft   04MAY2026 @ 12:30
S-308 Total Gate        0.0 ft   10APR2026 @ 13:10
S-80  Total Gate        -NR ft   06MAY2026 @ 12:52
S-80  Total Gate GR    -0.1 ft   06MAY2026 @ 12:30
 
 
-----Okeechobee Waterway Bottom of Gate-----------
Weirs:  S77=5.6 *** S78=-.03,1.6 *** S308=9.1
 
S-77 Gate Bottom       7.10 ft   03MAY2026 @ 15:00
S-308 Gate Bottom      9.10 ft   10APR2026 @ 13:10
 
-----Okeechobee Waterway Sector Gate Openings-----
S-77  Sector Gate       0.0 ft   01MAY2026 @ 00:01
S-78  Sector Gate       0.0 ft   01FEB2026 @ 07:00
S-79  Sector Gate       0.0 ft   03MAY2026 @ 13:00
S-308 Sector Gate       0.0 ft   06MAR2026 @ 07:00
S-80  Sector Gate       0.0 ft   05MAR2026 @ 07:10
 
-----Lake Inflows---------------------------------
S-65E                   172 cfs  06MAY2026 @ 11:00
S-65EX1                   0 cfs  06MAY2026 @ 11:00
S-154                     0 cfs  06MAY2026 @ 11:00
S-84                      0 cfs  06MAY2026 @ 11:00
S-84X                     0 cfs  06MAY2026 @ 11:00
S-71                      0 cfs  06MAY2026 @ 11:00
S-72                      0 cfs  06MAY2026 @ 11:00
Fisheating Cr             0 cfs  06MAY2026 @ 11:00
Culvert 5                 - cfs  06MAY2026 @ 12:52
S-191                     0 cfs  06MAY2026 @ 11:00
S-133 Pumps               0 cfs  06MAY2026 @ 11:00
S-127 Pumps               0 cfs  06MAY2026 @ 11:00
S-129 Pumps               0 cfs  06MAY2026 @ 11:00
S-131 Pumps               0 cfs  06MAY2026 @ 11:00
S-135 Pumps               0 cfs  06MAY2026 @ 11:00
S-351 Pumps               0 cfs  06MAY2026 @ 11:00
S-352 Pumps               0 cfs  06MAY2026 @ 11:00
S-354 Pumps               0 cfs  06MAY2026 @ 11:00
S-2 Pumps                 0 cfs  06MAY2026 @ 11:00
S-3 Pumps                 0 cfs  06MAY2026 @ 11:00
S-4 Pumps                 0 cfs  06MAY2026 @ 11:00
 
-----Lake Outflows--------------------------------
S-77  (Blw   895)       688 cfs  06MAY2026 @ 12:30
S-308 (Blw     -)         0 cfs  06MAY2026 @ 12:30
S-135 Culverts            0 cfs  06MAY2026 @ 11:00
S-127 Culverts            0 cfs  06MAY2026 @ 11:00
S-129 Culverts            0 cfs  06MAY2026 @ 11:00
S-131 Culverts            0 cfs  06MAY2026 @ 11:00
S-351 Spillway            0 cfs  06MAY2026 @ 11:00
S-352 Spillway          414 cfs  06MAY2026 @ 11:00
S-354 Spillway          620 cfs  06MAY2026 @ 11:00
L8 Canal Point           57 cfs  06MAY2026 @ 11:15
 
-----Caloosahatchee Estuary Inflows (Measured)----
S-79 (C-43 basin+LOK)   345 cfs  06MAY2026 @ 12:30
 
-----St. Lucie Estuary Inflows (Measured)---------
Gordy Rd (TMC basin)   2154 cfs  06MAY2026 @ 11:00
S-49 (C-24 basin)         0 cfs  06MAY2026 @ 11:00
S-97 (C-23 basin)         0 cfs  06MAY2026 @ 11:00
S-80 (C-44 basin+LOK)     0 cfs  06MAY2026 @ 12:30
 
-----St. Lucie Estuary Stages--------------------
South Fork @ Gaines    -NR- ft   06MAY2026 @ 12:52
Speedy Point           1.33 ft   06MAY2026 @ 11:45
Steele Point           1.25 ft   06MAY2026 @ 11:45
 
******** WATER CONSERVATION AREA 1 ***************
 
Site 1-8C             16.22 ft   06MAY2026 @ 11:00
Avg 7,8T,9            16.02 ft   06MAY2026 @ 11:00
 
S-39 (max 800 cfs)      127 cfs  06MAY2026 @ 11:00
 
S-10A                     0 cfs  06MAY2026 @ 12:30
S-10C                     0 cfs  06MAY2026 @ 12:30
S-10D                     0 cfs  06MAY2026 @ 12:30
S-10s combined            0 cfs  06MAY2026 @ 12:30
 
 
******** WATER CONSERVATION AREA 2A **************
 
Site 2-17             12.02 ft   06MAY2026 @ 11:00
S-11B Headwater       12.01 ft   06MAY2026 @ 11:45
 
S-38  (max 600 cfs)      75 cfs  06MAY2026 @ 11:00
S-34 (WCA-2B)             - cfs  06MAY2026 @ 12:52
     (max 450 cfs)
S-11A                     0 cfs  06MAY2026 @ 12:30
S-11B                     0 cfs  06MAY2026 @ 12:30
S-11C                     0 cfs  06MAY2026 @ 12:30
S-11s combined            0 cfs  06MAY2026 @ 12:30
(S-11's max each 16,700 cfs)
 
******** WATER CONSERVATION AREA 3A **************
 
Avg 63,64,65           8.11 ft   06MAY2026 @ 11:00
Inc-1 Action Line     10.18 ft   04MAY2026 @ 24:00
 
2Gage (62,63) avg:     9.15 ft   06MAY2026 @ 11:00
Note:FWCC Closure Criteria is 11.6
 
S-151 (max 1,105 cfs)   115 cfs  06MAY2026 @ 11:00
 
S-12A Headwater*       6.71 ft   06MAY2026 @ 11:00
S-12B Headwater*       6.67 ft   06MAY2026 @ 11:00
S-12C Headwater*       6.71 ft   06MAY2026 @ 11:00
S-12D Headwater*       6.69 ft   06MAY2026 @ 10:00
S-12A Tailwater        6.70 ft   06MAY2026 @ 11:00
S-12B Tailwater        6.69 ft   06MAY2026 @ 11:00
S-12C Tailwater        6.72 ft   06MAY2026 @ 11:00
S-12D Tailwater        6.70 ft   06MAY2026 @ 10:00
 
S-12A                     0 cfs  06MAY2026 @ 11:45
S-12B                     0 cfs  06MAY2026 @ 11:45
S-12C                     0 cfs  06MAY2026 @ 11:45
S-12D                     0 cfs  06MAY2026 @ 10:45
S-12s combined            0 cfs  06MAY2026 @ 10:45
 (S12's each max 8,000 cfs)
 
S-340                     - cfs  06MAY2026 @ 12:52
S-333 (Max 1350 cfs)      0 cfs  06MAY2026 @ 11:00
S-333N                   -  cfs  06MAY2026 @ 12:52
 
*Note: If the gates are fully closed, water will
overtop the gates at 11.00 ft.
 
Below S-12A             5.50 ft  06MAY2026 @ 12:15
 
******** L-29 CANAL ******************************
 
S-333 Tailwater        6.43 ft   06MAY2026 @ 11:00
S-334 Headwater        6.45 ft   06MAY2026 @ 11:00
Avg 333T,334H          6.44 ft   06MAY2026 @ 11:00
 
S-355B Removed 13May2016
S-334                     0 cfs  06MAY2026 @ 11:00
S-356                     - cfs  06MAY2026 @ 12:52
 
******** SDCS ************************************
 
S-335 HW (7.0-7.5)     4.99 ft   06MAY2026 @ 11:00
S-335 TW               4.41 ft   06MAY2026 @ 11:00
S-335                   105 cfs  06MAY2026 @ 11:00
S-336                     0 cfs  06MAY2026 @ 11:00
G-211                    97 cfs  06MAY2026 @ 11:00
S-331                     0 cfs  06MAY2026 @ 10:00
S-357                     0 cfs  06MAY2026 @ 11:00
 
Angels (GSE=6.2)       4.13 ft   06MAY2026 @ 11:00
LPG1 (GSE=6.6)         3.38 ft   06MAY2026 @ 11:00
Angels - LPG1 delta    0.75 ft   06MAY2026 @ 11:00
G-3273 (GSE=6.7)       4.47 ft   06MAY2026 @ 11:00
LPG2 (GSE=6.7)         3.42 ft   06MAY2026 @ 11:00
S-331 Headwater        3.48 ft   06MAY2026 @ 11:00
Las Palmas (LPC1)      -NR- ft   06MAY2026 @ 12:52
S-357N Headwater       3.37 ft   06MAY2026 @ 11:00
S-357 Headwater        3.33 ft   06MAY2026 @ 11:00
LPDC1(GSE=7.0)         -NR- ft   06MAY2026 @ 12:52
G-3628 (GSE=7.1)       3.27 ft   06MAY2026 @ 11:00
 
-----S-332s---------------------------------------
S-332B                    0 cfs  06MAY2026 @ 10:00
S-332C                    0 cfs  06MAY2026 @ 11:00
S-332D                    0 cfs  06MAY2026 @ 11:00
S-332DX1                  0 cfs  06MAY2026 @ 11:00
S-332s combined           0 cfs  06MAY2026 @ 11:00
 
S-332B HW              3.36  ft  06MAY2026 @ 11:00
S-332BN TW             -NR-  ft  06MAY2026 @ 12:52
S-332C HW              3.33  ft  06MAY2026 @ 11:00
S-332C TW              -NR-  ft  06MAY2026 @ 12:52
--------------------------------------------------
 
-----S-194*---------------------------------------
S-194 Headwater        -NR- ft   06MAY2026 @ 12:52
S-194 Tailwater        -NR- ft   06MAY2026 @ 12:52
S-194 Gate 1           -NR- ft   06MAY2026 @ 12:52
S-194 Gate 2           -NR- ft   06MAY2026 @ 12:52
S-194 Flow                0 cfs  06MAY2026 @ 11:00
(Max flow = 190 cfs)
--------------------------------------------------
*Last recorded values of manual readings
 
-----S-196*---------------------------------------
S-196 Headwater        -NR- ft   06MAY2026 @ 12:52
S-196 Tailwater        -NR- ft   06MAY2026 @ 12:52
S-196 Gate 1           0.00 ft   06MAY2026 @ 11:00
S-196 Flow                0 cfs  06MAY2026 @ 11:00
(Max flow = 200 cfs)
--------------------------------------------------
*Last recorded values of manual readings
 
-----S-176----------------------------------------
S-176 Headwater        3.32 ft   06MAY2026 @ 11:00
S-176 Tailwater        2.92 ft   06MAY2026 @ 11:00
S-176 Gate 1           0.00 ft   06MAY2026 @ 11:00
S-176 Flow                0 cfs  06MAY2026 @ 11:00
(Max flow = 630 cfs)
--------------------------------------------------
 
-----S-177----------------------------------------
S-177 Headwater        2.95 ft   06MAY2026 @ 11:00
S-177 Tailwater        2.45 ft   06MAY2026 @ 11:00
S-177 Gate 1          -0.02 ft   06MAY2026 @ 11:00
S-177 Flow                0 cfs  06MAY2026 @ 11:00
(Max flow = 1,400 cfs)
--------------------------------------------------
 
-----S-178----------------------------------------
S-178 Headwater        2.47 ft   06MAY2026 @ 11:00
S-178 Tailwater        2.42 ft   06MAY2026 @ 11:00
S-178 Gate 1           6.90 ft   06MAY2026 @ 11:00
S-178 Gate 2           6.95 ft   06MAY2026 @ 11:00
--------------------------------------------------
 
-----S-18C----------------------------------------
S-18C Headwater        2.43 ft   06MAY2026 @ 11:00
S-18C Tailwater        -NR- ft   06MAY2026 @ 12:52
S-18C Gate 1          -0.01 ft   06MAY2026 @ 11:00
S-18C Gate 2           0.00 ft   06MAY2026 @ 11:00
S-18C Velocity         0.00 fps  06MAY2026 @ 12:00
S-18C Flow USGS           0 cfs  06MAY2026 @ 12:00
(Max flow =  2,100 cfs)
--------------------------------------------------
 
-----S-197----------------------------------------
S-197 Headwater        2.02 ft   06MAY2026 @ 11:00
S-197 Tailwater        1.40 ft   06MAY2026 @ 11:00
S-197 Flow                0 cfs  06MAY2026 @ 11:00
(Max flow = 2,400 cfs)
--------------------------------------------------
 
**** KISSIMMEE ***********************************
 
S-65   49.33   46.33    352 cfs  06MAY2026 @ 11:00
S-65A  46.29   37.47    298 cfs  06MAY2026 @ 11:00
S-65D  25.94   21.04      0 cfs  06MAY2026 @ 11:00
S-65DX1                 305 cfs  06MAY2026 @ 11:00
S-65DX2                   0 cfs  06MAY2026 @ 11:00
S-65E  21.04   11.30    172 cfs  06MAY2026 @ 11:00
S-65EX1                   0 cfs  06MAY2026 @ 11:00
PC62                  33.60 ft   06MAY2026 @ 11:00
 
**************************************************
 
**** PUERTO RICO *********************************
Lake Guajataca         -NR-  ft  06MAY2026 @ 12:52
At Lares (last read)   -NR-  in  06MAY2026 @ 12:52
**************************************************
 
**** BRAVO REPORT DATA ***************************
 
WCA1
 Levee low points
   18.9 ft on L-7
   19.0 ft on L-39
3-gage avg:           16.02  ft  06MAY2026 @ 11:00
S10A Headwater        16.10  ft  06MAY2026 @ 11:45
SITE-8C               16.22  ft  06MAY2026 @ 11:00
 
WCA2A
 Levee low points
   17.5 ft on L-38 Sec 2 (US-27)
S11B Headwater        12.01  ft  06MAY2026 @ 11:45
SITE-17               12.02  ft  06MAY2026 @ 11:00
SITE-19               11.88  ft  06MAY2026 @ 11:45
 
WCA2B
 Levee low points
   13.0 ft on L-38E Sec 3
S143 Tailwater         7.97  ft  06MAY2026 @ 11:00
SITE-99                9.04  ft  06MAY2026 @ 11:00
 
WCA3A
 Levee low points
   14.3 ft on L-29 Sec 2
S12D Headwater         6.69  ft  06MAY2026 @ 10:00
SITE-63                8.45  ft  06MAY2026 @ 11:00
SITE-64                8.32  ft  06MAY2026 @ 11:00
SITE-65                7.57  ft  06MAY2026 @ 11:00
L37WCA3A*              -NR-  ft  06MAY2026 @ 12:52
WCA3A 3G Avg           8.11  ft  06MAY2026 @ 11:00
 
WCA3B
 Levee low points
   12.4 ft on L-29 Sec 3
S355A Headwater        6.51  ft  06MAY2026 @ 11:45
SITE-71                6.43  ft  06MAY2026 @ 11:00
SITE-76                6.02  ft  06MAY2026 @ 11:00
SHARK1                 6.09  ft  06MAY2026 @ 11:00
 
**************************************************