s77m Julian Keen, Jr Lock and Dam (S-77) Daily Morning Report Data Ending at 2400 Hours Note: Headwater, tailwater, and stage values below are instantaneous values unless otherwise specified. Flow value is an Average-Daily Value at Spillway ===Wind==== Manual Head Tail Flow Precip Dir Speed Locks Barometer Evap Precip (ft-msl)(ft-msl) (cfs) (in) (deg) (mph) (#) (Hg") (mBar) (in) (in) 09SEP26 11.16 10.99 0 NR 23 NR 3 30.08 1018.5 0.00 0.52 10SEP26 11.25 10.85 0 NR 33 NR 4 30.03 1017.1 0.30 0.06 11SEP26 11.23 10.94 0 NR 163 NR 0 29.98 1015.4 0.29 0.05 12SEP26 11.36 10.98 0 NR 101 NR 1 30.03 1017.1 0.03 0.06 13SEP26 11.16 10.80 0 NR 235 NR 2 30.04 1017.3 0.00 0.53 14SEP26 11.44 11.07 0 NR 122 NR 3 30.03 1017.1 0.34 0.00 15SEP26 11.49 10.74 0 NR 334 NR NR 30.10 1019.2 NR NR Gate Openings (ft) Gate1 Gate2 Gate3 Gate4 09SEP26 0.0 0.0 0.0 0.0 10SEP26 0.0 0.0 0.0 0.0 11SEP26 0.0 0.0 0.0 0.0 12SEP26 0.0 0.0 0.0 0.0 13SEP26 0.0 0.0 0.0 0.0 14SEP26 0.0 0.0 0.0 0.0 15SEP26 0.0 0.0 0.0 0.0 Report Generated 16SEP2026 @ 13:07