s77m
                      Julian Keen, Jr  Lock and Dam (S-77)
                 Daily Morning Report Data Ending at 2400 Hours
 
 Note: Headwater, tailwater, and stage values below are instantaneous values
       unless otherwise specified.
       Flow value is an Average-Daily Value at Spillway
                                    ===Wind====                           Manual
        Head    Tail   Flow  Precip  Dir  Speed Locks  Barometer     Evap Precip
      (ft-msl)(ft-msl) (cfs)  (in)  (deg) (mph)  (#)  (Hg") (mBar)   (in)  (in)
05JUN26 11.27   10.71    NR    NR     57    NR    3   30.06 1017.8  0.31   0.00
06JUN26 11.39   10.74   441    NR     63    NR    8   30.01 1016.4  0.33   0.00
07JUN26 11.13   10.67   556    NR    102    NR    9   30.03 1016.9  0.31   0.00
08JUN26 11.16   10.59   576    NR    110    NR    3   30.11 1019.7  0.33   0.00
09JUN26 11.09   10.49   548    NR    166    NR   11   30.07 1018.2  0.34   0.00
10JUN26 10.88   10.60   686    NR    100    NR    6   30.03 1017.1  0.34   0.00
11JUN26 10.90   10.64   486    NR    262    NR   NR   30.04 1017.4    NR     NR
 
       Gate Openings (ft) Gate1  Gate2  Gate3  Gate4
05JUN26                     0.0    3.0    0.0    0.0
06JUN26                     3.0    3.0    0.0    0.0
07JUN26                     3.0    3.0    0.0    0.0
08JUN26                     3.0    3.0    0.0    0.0
09JUN26                     3.0    3.0    0.0    0.0
10JUN26                     4.0    4.0    0.0    0.0
11JUN26                     4.0    4.0    0.0    0.0
Report Generated 12JUN2026 @ 04:39