s77m Julian Keen, Jr Lock and Dam (S-77) Daily Morning Report Data Ending at 2400 Hours Note: Headwater, tailwater, and stage values below are instantaneous values unless otherwise specified. Flow value is an Average-Daily Value at Spillway ===Wind==== Manual Head Tail Flow Precip Dir Speed Locks Barometer Evap Precip (ft-msl)(ft-msl) (cfs) (in) (deg) (mph) (#) (Hg") (mBar) (in) (in) 02FEB26 12.54 11.24 750 NR 336 NR 8 30.36 1028.2 0.03 0.00 03FEB26 12.62 10.85 193 NR 133 NR 10 30.25 1024.3 0.07 0.00 04FEB26 12.48 10.60 136 NR 184 NR 6 30.07 1018.4 0.09 0.00 05FEB26 12.28 10.73 216 NR 294 NR 9 30.08 1018.7 0.06 0.00 06FEB26 12.27 10.88 207 NR 234 NR 3 30.05 1017.5 0.11 0.00 07FEB26 12.53 10.81 213 NR 330 NR 13 30.19 1022.2 0.12 0.00 08FEB26 12.41 10.90 216 NR 49 NR 7 30.26 1024.6 0.13 0.00 Gate Openings (ft) Gate1 Gate2 Gate3 Gate4 02FEB26 0.0 3.5 0.0 0.5 03FEB26 0.0 0.5 0.0 0.0 04FEB26 0.5 0.5 0.0 0.5 05FEB26 0.5 0.5 0.0 0.5 06FEB26 0.5 0.5 0.0 0.5 07FEB26 0.5 0.5 0.0 0.5 08FEB26 0.5 0.5 0.0 0.5 Report Generated 09FEB2026 @ 19:07