sitrep
                 Situation Report of Hydrometeorologic Conditions
                       Jacksonville District (CESAJ-EN-WW)
                                   10 JUN 2026
 
 
Data Ending 2400 hours 09 JUN 2026
********************************************************************************
Kissimmee Basin Lake Regulation            Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Hart & Mary Jane                            59.36        -NR-       -NR-
  East Tohopekaliga                           54.87       56.50      -1.63
  Tohopekaliga                                51.95       53.50      -1.55
 
  Myrtle, Preston, Joel                       59.76       61.00      -1.24
  Trout, Coon, Center, Lizzie & Alligator     61.98       63.20      -1.22
  Gentry          Lake Gage = 59.36     S63 = 59.41       61.00      -1.59
 
  Cypress                                     48.98       51.50      -2.52
  Hatchineha                                  48.93       51.50      -2.57
  Kissimmee                                   48.96       51.50      -2.54
  Istokpoga                                    -NR-       38.25       -NR-
********************************************************************************
                  Okeechobee Lake Regulation
 
                                       Elev        Last Year
                                     (ft-NGVD)     (ft-NGVD)
Avg Daily Lake Okeechobee Elev         11.15          11.16
 Currently in Zone D
              Regulation Schedule for 09 JUN 2026
    _________________________________________________________
    LOSOM24 Regulation ZoneA=        16.54
    LOSOM24 Regulation ZoneBC=       16.14
    LOSOM24 Regulation ZoneD=        10.67
    _________________________________________________________
 
Current volume of water in the Lake is  2,419,500 ac-ft.
 
Lake Okeechobee elevation is -2.00 feet below normal for this time of year,
based on todays historical lake average of 13.15 ft-NGVD for the period 1965-07.
 
Herbert Hoover Dike Emergency Action Plan
  Current Monitoring Plan Condition Level - NORMAL
  Monitoring Plan Condition Levels - see EAP page A-2 for more details
    Normal Operations - Lake level below 15.5'
               Lake Level       Inspection Interval, Notes
 
    Level 1 - 15.5 to 16.49      7 to 30 day, varies by reach
    Level 2 - 16.5 to 17.49      1 to  7 day inspections by SFOO, monthly
                                           by CESAJ-EN and OD staff
    Level 3 - > 17.5             daily, SFOO, CESAJ-EN and OD staff
********************************************************************************
WCA-1 Area Regulation                      Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 1-8C                                   16.07       15.75       0.32
  Average of Sites 1-7, 1-9, 1-8T             15.98       15.75       0.23
 
  Regulation Zone Elevations              A2= 15.75   B= 15.75   C= 14.00
 
Storage at the current elevation is    163,400 ac-ft.
********************************************************************************
WCA-2A Area Regulation                     Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 2-17                                   11.60       11.00       0.60
  Site S11B Headwater                         10.40       11.00      -0.60
 
Storage at the current elevation for Site2-17 is     72,000 ac-ft.
Storage at the current elevation for S11B HW is     -NR-    ac-ft.
********************************************************************************
WCA-3A Area Regulation                     Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Average of Sites 63, 64, 65                  7.95        -NR-       -NR-
  Site 62 - Deer Gage                         11.05       11.60      -0.55
  S-333 Headwater                              7.27
  Regulation Zone Elevations   B=  9.55    C=  -NR-    D=  -NR-   E=  -NR-
 
Storage at the current elevation is     98,000 ac-ft.
 
Site 71 elevation in WCA-3B is  6.55 .
********************************************************************************
Portugues and Bucana Rivers, Puerto Rico   Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Cerrillos                                    -NR-      573.00       -NR-
********************************************************************************
 
Report Generated 10JUN2026 @ 13:39  ** Preliminary Data - Subject to Revision **