             Headwater Tailwater         ----------- Gate Positions ------------
             Elevation Elevation  Disch   #1   #2   #3   #4   #5   #6   #7   #8
             (ft-msl)  (ft-msl)   (cfs)  (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
                               (I) see note
Water Conservation Area #1
Inflows
 G300:         13.98     16.09       0   0.00 0.00
 G301:         13.91     16.25       0   0.00 0.00 0.00
                                        Speed of Pumps S362,G251,G310 (RPM)
 S362:         12.74     15.61      80     0   1   0   0   0-NR--NR-
 G251:          9.00     16.20     196  -NR--NR--NR--NR--NR-
 G310:          -NR-      -NR-       0  -NR--NR-   1   0   1   0
Inflows:    276      cfs
________________________________________________________________________________
Outflows
  S10D:        16.26     13.65      68   0.00 0.00 0.00 0.00
  S10C:        16.20     13.71      70   0.00 0.00 0.00 0.00
  S10A:        16.17     13.67      75   0.00 0.00 0.00 0.00
  Total S10 Discharge:             213
  G94A:        12.84     16.18       0   0.00 0.00
  G94C:         -NR-      -NR-       0   -NR- -NR-
  S39:         16.22      8.38       0   0.00
  G338:                              0
  S5AS:        13.89     13.85       0
Outflows:    213     cfs
Net Structure Flows (Inflows - Outflows):     63    cfs
________________________________________________________________________________
Stage
  Site 1-7:    16.32       3 Station Average  =  16.24
  Site 1-8T:   16.15       (Site 1-7, 1-8T and 1-9)
  Site 1-8C:   16.30       2 Station Average  =  16.19
  Site 1-9:    16.24       (Site 1-9 and 1-8T for Temp. Deviation)
  L8:           -NR-
  BLW S5AW:     -NR-
  S5AW:         9.23
________________________________________________________________________________
Daily Precipitation Totals
                                 1-Day       3-Day       7-Day
                                 (inches)    (inches)    (inches)
  S5A Pump Station:                -NR-        0.00        0.00
  Site 1-7:                        -NR-        0.00        0.00
  Site 1-8T:                       -NR-        0.00        0.00
  Site 1-8C:(Bad Gage)             -NR-        0.00        0.00
  Site 1-9:                        -NR-        0.00        0.00
  S6 Pump Station:                 -NR-        0.00        0.00
  S10D: (Bad Gage)                 -NR-        0.00        0.00
  -----------------------------------------------------------------
        WCA-1 Average  (Gages)     -NR-        0.00        0.00
        (Site 1-8C and S10D not included)
  -----------------------------------------------------------------
  WCA1 Nexrad Basin Avg            -NR-        0.00        0.00
  -----------------------------------------------------------------
 
________________________________________________________________________________
WCA-1 Regulation Schedules
                                            Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 1-8C                                   16.30       15.75       0.55
  Average of Sites 1-7, 1-9, 1-8T             16.24       15.75       0.49
  Zone A2 with Site 1-8C                      16.30       15.75       0.55
  Zone A2 with Site 1-7, 1-9, 1-8T            16.24       15.75       0.49
  Floor (Site 8C)                             16.30       14.00       2.30
  Floor (AVG Site 7,9,8T)                     16.24       14.00       2.24
 
  Regulation Zone Elevations              A2= 15.75   B= 15.75   C= 14.00
  Available storage:   -65,860 acre-feet
 
 ------------------------------------------------------------------------------
 *    DATES     !    USE GAGE      !        CONDITIONS                        *
 * 1JAN - 30JUN ! 1-8C (Canal)     !    All                                   *
 * 1JUL - 31DEC ! 1-8C (Canal)     !    Except as noted below                 *
 *              ! Average of 1-7,  !    During rising stages when canal       *
 *              ! 1-8T, and 1-9    !    stage exceeds average.                *
 ------------------------------------------------------------------------------
 
                                       3Station   Diff  Site8C   Diff
WCA-1 Elevations      29 JUN 2022         16.24          16.30
   29JUN22  -1 Day  = 28 JUN 2022 @ 2400  16.25   0.01   16.29  -0.01
   29JUN22  -2 Days = 27 JUN 2022 @ 2400  16.28   0.04   16.33   0.03
   29JUN22  -3 Days = 26 JUN 2022 @ 2400  16.30   0.06   16.37   0.07
   29JUN22  -4 Days = 25 JUN 2022 @ 2400  16.31   0.07   16.37   0.07
   29JUN22  -5 Days = 24 JUN 2022 @ 2400  16.33   0.09   16.37   0.07
   29JUN22  -6 Days = 23 JUN 2022 @ 2400   -NR-   -NR-   16.37   0.07
   29JUN22  -7 Days = 22 JUN 2022 @ 2400   -NR-   -NR-   16.37   0.07
   29JUN22 -30 Days = 30 MAY 2022 @ 2400   -NR-   -NR-   15.89  -0.41
 
  S5AE:        13.82     11.12           0.00 0.00
  S5A Pumps:    9.21     13.85    -NR-   -NR- -NR- -NR- -NR- -NR- -NR- (cfs)
 G302:         13.95     12.52           1.80 1.80
___________________________________________________________________________
___________________________________________________________________________
Water Conservation Area #2
  S6 Pumps:     9.89     14.01       0      0    0    0                (cfs)
 
  Average of Sites 1-9 and 1-8T               16.19
  7 Day Recession Rate (ft/wk)                 -NR-
  (Note: Rainfall check not complete)
                                             ELEV      Diff
2Station Avg.         29 JUN 2022             16.19
   29JUN22  -1 Day  = 28 JUN 2022 @ 2400      16.21     0.02
   29JUN22  -2 Days = 27 JUN 2022 @ 2400      16.24     0.05
   29JUN22  -3 Days = 26 JUN 2022 @ 2400      16.26     0.07
   29JUN22  -4 Days = 25 JUN 2022 @ 2400      16.27     0.08
   29JUN22  -5 Days = 24 JUN 2022 @ 2400      16.28     0.09
   29JUN22  -6 Days = 23 JUN 2022 @ 2400       -NR-     -NR-
   29JUN22  -7 Days = 22 JUN 2022 @ 2400       -NR-     -NR-
   29JUN22 -30 Days = 30 MAY 2022 @ 2400       -NR-     -NR-
___________________________________________________________________________
 
(I) - Flows marked with "I" signify that this is an instantaneous flow
      computed from the single value reported for the day.
      Otherwise, flow is a daily average.
Report Generated 30 JUN 2022 @ 06:39
** Preliminary Data - Subject to Revision **