wca1
 
                          U. S. Army Corps of Engineers
                              Jacksonville District
 
                        Water Conservation Area #1 Report
 
Data Ending 2400 hours   03 AUG 2026
 
Note: Headwater, tailwater, and stage values below are instantaneous values
      unless otherwise specified.
 
             Headwater Tailwater         ----------- Gate Positions ------------
             Elevation Elevation  Disch   #1   #2   #3   #4   #5   #6   #7   #8
             (ft-msl)  (ft-msl)   (cfs)  (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
                               (I) see note
Water Conservation Area #1
Inflows
 G300:         13.34     16.05       0   0.00 0.00
 G301:         13.30     16.13       0   0.00 0.00 0.00
                                        Speed of Pumps S362,G251,G310 (RPM)
 S362:         12.75     16.04      20     0   1   0   0   0   0   0
 G251:          9.34     16.10       0  -NR--NR--NR--NR--NR-
 G310:          -NR-      -NR-       0     0   0   1   0   1   0
Inflows:     20      cfs
________________________________________________________________________________
Outflows
  S10D:        16.11     12.22       0   0.00 0.00 0.00 0.00
  S10C:        16.12     12.20       0   0.00 0.00 0.00 0.00
  S10A:        16.08     12.18       0   0.00 0.00 0.00 0.00
  Total S10 Discharge:               0
  G94A:       ******    ******    -NR-   0.00 0.00
  S39:         16.12      8.28       0   0.00
  G338:                              0
  S5AS:        10.48     13.23       0
Outflows:   -NR-     cfs
Net Structure Flows (Inflows - Outflows):   -NR-    cfs
________________________________________________________________________________
Stage
  Site 1-7:    16.04       3 Station Average  =  16.02
  Site 1-8T:   16.06       (Site 1-7, 1-8T and 1-9)
  Site 1-8C:   16.21       2 Station Average  =  16.01
  Site 1-9:    15.96       (Site 1-9 and 1-8T for Temp. Deviation)
  L8:           -NR-
  BLW S5AW:     -NR-
  S5AW:        10.51
________________________________________________________________________________
Daily Precipitation Totals
                                 1-Day       3-Day       7-Day
                                 (inches)    (inches)    (inches)
  S5A Pump Station:                -NR-        0.00        0.00
  Site 1-7:                        -NR-        0.00        0.00
  Site 1-8T:                       -NR-        0.00        0.00
  Site 1-8C:(Bad Gage)             -NR-        0.00        0.00
  Site 1-9:                        -NR-        0.00        0.00
  S6 Pump Station:                 -NR-        0.00        0.00
  S10D: (Bad Gage)                 -NR-        0.00        0.00
  -----------------------------------------------------------------
        WCA-1 Average  (Gages)     -NR-        0.00        0.00
        (Site 1-8C and S10D not included)
  -----------------------------------------------------------------
  WCA1 Nexrad Basin Avg            -NR-        0.00        0.00
  -----------------------------------------------------------------
 
________________________________________________________________________________
WCA-1 Regulation Schedules
                                            Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 1-8C                                   16.21       16.35      -0.14
  Average of Sites 1-7, 1-9, 1-8T             16.02       16.35      -0.33
  Zone A2 with Site 1-8C                      16.21       15.75       0.46
  Zone A2 with Site 1-7, 1-9, 1-8T            16.02       15.75       0.27
  Floor (Site 8C)                             16.21       14.00       2.21
  Floor (AVG Site 7,9,8T)                     16.02       14.00       2.02
 
  Regulation Zone Elevations              A2= 16.35   B= 15.75   C= 14.00
  Available storage:    35,230 acre-feet
 
 ------------------------------------------------------------------------------
 *    DATES     !    USE GAGE      !        CONDITIONS                        *
 * 1JAN - 30JUN ! 1-8C (Canal)     !    All                                   *
 * 1JUL - 31DEC ! 1-8C (Canal)     !    Except as noted below                 *
 *              ! Average of 1-7,  !    During rising stages when canal       *
 *              ! 1-8T, and 1-9    !    stage exceeds average.                *
 ------------------------------------------------------------------------------
 
                                       3Station   Diff  Site8C   Diff
WCA-1 Elevations      03 AUG 2026         16.02          16.21
   03AUG26  -1 Day  = 02 AUG 2026 @ 2400  16.02   0.00   16.21   0.00
   03AUG26  -2 Days = 01 AUG 2026 @ 2400  15.93  -0.09   16.19  -0.02
   03AUG26  -3 Days = 31 JUL 2026 @ 2400  15.95  -0.07   16.20  -0.01
   03AUG26  -4 Days = 30 JUL 2026 @ 2400  15.97  -0.05   16.20  -0.01
   03AUG26  -5 Days = 29 JUL 2026 @ 2400  15.99  -0.03   16.23   0.02
   03AUG26  -6 Days = 28 JUL 2026 @ 2400  16.01  -0.01   16.24   0.03
   03AUG26  -7 Days = 27 JUL 2026 @ 2400  16.02   0.00   16.26   0.05
   03AUG26 -30 Days = 04 JUL 2026 @ 2400  16.00  -0.02   16.18  -0.03
 
  S5AE:        10.59     11.26           0.00 0.00
  S5A Pumps:   10.46     13.25    -NR-   -NR- -NR- -NR- -NR- -NR- -NR- (cfs)
 G302:         13.28     11.16           0.00 0.00
___________________________________________________________________________
___________________________________________________________________________
Water Conservation Area #2
  S6 Pumps:    10.52     14.52     398    136    0  262                (cfs)
 
  Average of Sites 1-9 and 1-8T               16.01
  7 Day Recession Rate (ft/wk)                 0.00
  (Note: Rainfall check not complete)
                                             ELEV      Diff
2Station Avg.         03 AUG 2026             16.01
   03AUG26  -1 Day  = 02 AUG 2026 @ 2400      16.01     0.00
   03AUG26  -2 Days = 01 AUG 2026 @ 2400      15.94    -0.07
   03AUG26  -3 Days = 31 JUL 2026 @ 2400      15.95    -0.06
   03AUG26  -4 Days = 30 JUL 2026 @ 2400      15.97    -0.04
   03AUG26  -5 Days = 29 JUL 2026 @ 2400      15.99    -0.02
   03AUG26  -6 Days = 28 JUL 2026 @ 2400      16.00    -0.01
   03AUG26  -7 Days = 27 JUL 2026 @ 2400      16.01     0.00
   03AUG26 -30 Days = 04 JUL 2026 @ 2400      16.06     0.05
___________________________________________________________________________
 
(I) - Flows marked with "I" signify that this is an instantaneous flow
      computed from the single value reported for the day.
      Otherwise, flow is a daily average.
Report Generated 04 AUG 2026 @ 04:45
** Preliminary Data - Subject to Revision **