wca1 U. S. Army Corps of Engineers Jacksonville District Water Conservation Area #1 Report Data Ending 2400 hours 29 JUN 2022 Note: Headwater, tailwater, and stage values below are instantaneous values unless otherwise specified. Headwater Tailwater ----------- Gate Positions ------------ Elevation Elevation Disch #1 #2 #3 #4 #5 #6 #7 #8 (ft-msl) (ft-msl) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (I) see note Water Conservation Area #1 Inflows G300: 13.98 16.09 0 0.00 0.00 G301: 13.91 16.25 0 0.00 0.00 0.00 Speed of Pumps S362,G251,G310 (RPM) S362: 12.74 15.61 80 0 1 0 0 0-NR--NR- G251: 9.00 16.20 196 -NR--NR--NR--NR--NR- G310: -NR- -NR- 0 -NR--NR- 1 0 1 0 Inflows: 276 cfs ________________________________________________________________________________ Outflows S10D: 16.26 13.65 68 0.00 0.00 0.00 0.00 S10C: 16.20 13.71 70 0.00 0.00 0.00 0.00 S10A: 16.17 13.67 75 0.00 0.00 0.00 0.00 Total S10 Discharge: 213 G94A: 12.84 16.18 0 0.00 0.00 G94C: -NR- -NR- 0 -NR- -NR- S39: 16.22 8.38 0 0.00 G338: 0 S5AS: 13.89 13.85 0 Outflows: 213 cfs Net Structure Flows (Inflows - Outflows): 63 cfs ________________________________________________________________________________ Stage Site 1-7: 16.32 3 Station Average = 16.24 Site 1-8T: 16.15 (Site 1-7, 1-8T and 1-9) Site 1-8C: 16.30 2 Station Average = 16.19 Site 1-9: 16.24 (Site 1-9 and 1-8T for Temp. Deviation) L8: -NR- BLW S5AW: -NR- S5AW: 9.23 ________________________________________________________________________________ Daily Precipitation Totals 1-Day 3-Day 7-Day (inches) (inches) (inches) S5A Pump Station: -NR- 0.00 0.00 Site 1-7: -NR- 0.00 0.00 Site 1-8T: -NR- 0.00 0.00 Site 1-8C:(Bad Gage) -NR- 0.00 0.00 Site 1-9: -NR- 0.00 0.00 S6 Pump Station: -NR- 0.00 0.00 S10D: (Bad Gage) -NR- 0.00 0.00 ----------------------------------------------------------------- WCA-1 Average (Gages) -NR- 0.00 0.00 (Site 1-8C and S10D not included) ----------------------------------------------------------------- WCA1 Nexrad Basin Avg -NR- 0.00 0.00 ----------------------------------------------------------------- ________________________________________________________________________________ WCA-1 Regulation Schedules Elevation Regulation Departure (ft-NGVD) (ft-NGVD) (feet) Site 1-8C 16.30 15.75 0.55 Average of Sites 1-7, 1-9, 1-8T 16.24 15.75 0.49 Zone A2 with Site 1-8C 16.30 15.75 0.55 Zone A2 with Site 1-7, 1-9, 1-8T 16.24 15.75 0.49 Floor (Site 8C) 16.30 14.00 2.30 Floor (AVG Site 7,9,8T) 16.24 14.00 2.24 Regulation Zone Elevations A2= 15.75 B= 15.75 C= 14.00 Available storage: -65,860 acre-feet ------------------------------------------------------------------------------ * DATES ! USE GAGE ! CONDITIONS * * 1JAN - 30JUN ! 1-8C (Canal) ! All * * 1JUL - 31DEC ! 1-8C (Canal) ! Except as noted below * * ! Average of 1-7, ! During rising stages when canal * * ! 1-8T, and 1-9 ! stage exceeds average. * ------------------------------------------------------------------------------ 3Station Diff Site8C Diff WCA-1 Elevations 29 JUN 2022 16.24 16.30 29JUN22 -1 Day = 28 JUN 2022 @ 2400 16.25 0.01 16.29 -0.01 29JUN22 -2 Days = 27 JUN 2022 @ 2400 16.28 0.04 16.33 0.03 29JUN22 -3 Days = 26 JUN 2022 @ 2400 16.30 0.06 16.37 0.07 29JUN22 -4 Days = 25 JUN 2022 @ 2400 16.31 0.07 16.37 0.07 29JUN22 -5 Days = 24 JUN 2022 @ 2400 16.33 0.09 16.37 0.07 29JUN22 -6 Days = 23 JUN 2022 @ 2400 -NR- -NR- 16.37 0.07 29JUN22 -7 Days = 22 JUN 2022 @ 2400 -NR- -NR- 16.37 0.07 29JUN22 -30 Days = 30 MAY 2022 @ 2400 -NR- -NR- 15.89 -0.41 S5AE: 13.82 11.12 0.00 0.00 S5A Pumps: 9.21 13.85 -NR- -NR- -NR- -NR- -NR- -NR- -NR- (cfs) G302: 13.95 12.52 1.80 1.80 ___________________________________________________________________________ ___________________________________________________________________________ Water Conservation Area #2 S6 Pumps: 9.89 14.01 0 0 0 0 (cfs) Average of Sites 1-9 and 1-8T 16.19 7 Day Recession Rate (ft/wk) -NR- (Note: Rainfall check not complete) ELEV Diff 2Station Avg. 29 JUN 2022 16.19 29JUN22 -1 Day = 28 JUN 2022 @ 2400 16.21 0.02 29JUN22 -2 Days = 27 JUN 2022 @ 2400 16.24 0.05 29JUN22 -3 Days = 26 JUN 2022 @ 2400 16.26 0.07 29JUN22 -4 Days = 25 JUN 2022 @ 2400 16.27 0.08 29JUN22 -5 Days = 24 JUN 2022 @ 2400 16.28 0.09 29JUN22 -6 Days = 23 JUN 2022 @ 2400 -NR- -NR- 29JUN22 -7 Days = 22 JUN 2022 @ 2400 -NR- -NR- 29JUN22 -30 Days = 30 MAY 2022 @ 2400 -NR- -NR- ___________________________________________________________________________ (I) - Flows marked with "I" signify that this is an instantaneous flow computed from the single value reported for the day. Otherwise, flow is a daily average. Report Generated 30 JUN 2022 @ 06:39 ** Preliminary Data - Subject to Revision **