                        Water Conservation Area #1 Report
 
Data Ending 2400 hours   06 DEC 2022
 
Note: Headwater, tailwater, and stage values below are instantaneous values
      unless otherwise specified.
 
             Headwater Tailwater         ----------- Gate Positions ------------
             Elevation Elevation  Disch   #1   #2   #3   #4   #5   #6   #7   #8
             (ft-msl)  (ft-msl)   (cfs)  (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
                               (I) see note
Water Conservation Area #1
Inflows
 G300:         13.32     17.26       0   0.00 0.00
 G301:         13.41     17.39       0   0.00 0.00 0.00
                                        Speed of Pumps S362,G251,G310 (RPM)
 S362:         11.52     17.37      19     0   1   0   0   0-NR--NR-
 G251:          9.50     17.36       0  -NR--NR--NR--NR--NR-
 G310:          -NR-      -NR-       0  -NR--NR-   0   0   0   0
Inflows:     19      cfs
________________________________________________________________________________
Outflows
  S10D:        17.41     13.18       0   0.00 0.00 0.00 0.00
  S10C:        17.40     13.22       0   0.00 0.00 0.00 0.00
  S10A:        17.38     13.21       0   0.00 0.00 0.00 0.00
  Total S10 Discharge:               0
  G94A:        13.82     17.37       0   0.00 0.00
  S39:         17.42      8.51       0   0.00
  G338:                              0
  S5AS:        13.34     13.34       0
Outflows:      0     cfs
Net Structure Flows (Inflows - Outflows):     19    cfs
________________________________________________________________________________
Stage
  Site 1-7:    17.33       3 Station Average  =  17.34
  Site 1-8T:   17.34       (Site 1-7, 1-8T and 1-9)
  Site 1-8C:   17.48       2 Station Average  =  17.35
  Site 1-9:    17.36       (Site 1-9 and 1-8T for Temp. Deviation)
  L8:           -NR-
  BLW S5AW:     -NR-
  S5AW:         9.94
________________________________________________________________________________
Daily Precipitation Totals
                                 1-Day       3-Day       7-Day
                                 (inches)    (inches)    (inches)
  S5A Pump Station:                -NR-        0.00        0.00
  Site 1-7:                        -NR-        0.00        0.00
  Site 1-8T:                       -NR-        0.00        0.00
  Site 1-8C:(Bad Gage)             -NR-        0.00        0.00
  Site 1-9:                        -NR-        0.00        0.00
  S6 Pump Station:                 -NR-        0.00        0.00
  S10D: (Bad Gage)                 -NR-        0.00        0.00
  -----------------------------------------------------------------
        WCA-1 Average  (Gages)     -NR-        0.00        0.00
        (Site 1-8C and S10D not included)
  -----------------------------------------------------------------
  WCA1 Nexrad Basin Avg            -NR-        0.00        0.00
  -----------------------------------------------------------------
 
________________________________________________________________________________
WCA-1 Regulation Schedules
                                            Elevation   Regulation  Departure
                                           (ft-NGVD)   (ft-NGVD)     (feet)
  Site 1-8C                                   17.48       17.44       0.04
  Average of Sites 1-7, 1-9, 1-8T             17.34       17.44      -0.10
  Zone A2 with Site 1-8C                      17.48       17.00       0.48
  Zone A2 with Site 1-7, 1-9, 1-8T            17.34       17.00       0.34
  Floor (Site 8C)                             17.48       14.00       3.48
  Floor (AVG Site 7,9,8T)                     17.34       14.00       3.34
 
  Regulation Zone Elevations              A2= 17.44   B= 17.00   C= 14.00
  Available storage:    14,000 acre-feet
 
 ------------------------------------------------------------------------------
 *    DATES     !    USE GAGE      !        CONDITIONS                        *
 * 1JAN - 30JUN ! 1-8C (Canal)     !    All                                   *
 * 1JUL - 31DEC ! 1-8C (Canal)     !    Except as noted below                 *
 *              ! Average of 1-7,  !    During rising stages when canal       *
 *              ! 1-8T, and 1-9    !    stage exceeds average.                *
 ------------------------------------------------------------------------------
 
                                       3Station   Diff  Site8C   Diff
WCA-1 Elevations      06 DEC 2022         17.34          17.48
   06DEC22  -1 Day  = 05 DEC 2022 @ 2400  17.36   0.02   17.49   0.01
   06DEC22  -2 Days = 04 DEC 2022 @ 2400  17.36   0.02   17.50   0.02
   06DEC22  -3 Days = 03 DEC 2022 @ 2400  17.37   0.03   17.51   0.03
   06DEC22  -4 Days = 02 DEC 2022 @ 2400  17.38   0.04   17.51   0.03
   06DEC22  -5 Days = 01 DEC 2022 @ 2400  17.40   0.06   17.53   0.05
   06DEC22  -6 Days = 30 NOV 2022 @ 2400  17.41   0.07   17.55   0.07
   06DEC22  -7 Days = 29 NOV 2022 @ 2400  17.41   0.07   17.55   0.07
   06DEC22 -30 Days = 06 NOV 2022 @ 2400  17.12  -0.22   17.24  -0.24
 
  S5AE:        13.41     10.72           0.00 0.00
  S5A Pumps:    9.91     13.35    -NR-   -NR- -NR- -NR- -NR- -NR- -NR- (cfs)
 G302:         13.39     12.47           0.90 0.90
___________________________________________________________________________
___________________________________________________________________________
Water Conservation Area #2
  S6 Pumps:    10.00     13.19       0      0    0    0                (cfs)
 
  Average of Sites 1-9 and 1-8T               17.35
  7 Day Recession Rate (ft/wk)                 0.07
  (Note: Rainfall check not complete)
                                             ELEV      Diff
2Station Avg.         06 DEC 2022             17.35
   06DEC22  -1 Day  = 05 DEC 2022 @ 2400      17.37     0.02
   06DEC22  -2 Days = 04 DEC 2022 @ 2400      17.37     0.02
   06DEC22  -3 Days = 03 DEC 2022 @ 2400      17.37     0.02
   06DEC22  -4 Days = 02 DEC 2022 @ 2400      17.39     0.04
   06DEC22  -5 Days = 01 DEC 2022 @ 2400      17.40     0.05
   06DEC22  -6 Days = 30 NOV 2022 @ 2400      17.42     0.07
   06DEC22  -7 Days = 29 NOV 2022 @ 2400      17.42     0.07
   06DEC22 -30 Days = 06 NOV 2022 @ 2400      17.13    -0.22
___________________________________________________________________________
 
(I) - Flows marked with "I" signify that this is an instantaneous flow
      computed from the single value reported for the day.
      Otherwise, flow is a daily average.
Report Generated 07 DEC 2022 @ 18:39